Precise WeatherExterior Painting & Coatings

For exterior painting and coatings contractors

Start the coat at the hour it'll cure.

Every coat checked against dew, your product minimum and rain-safe hours, with odds from up to 146 forecast runs.

Try the Exterior Painting & Coatings app

The costly call

A blushed finish coat is a repaint on your dime

A finish coat that blushes or streaks under evening dew, or gets rained on before it is rain-safe, is a repaint on your dime. A "20% chance of rain" says nothing about dew at 5 PM.

How it works

From your place to an answer

  1. Add the job

    Type the address of the house or building. Each job gets its own forecast.

  2. Set your data sheet numbers

    Set your product minimum, dew spread, rain-free hours and surface type from the data sheet.

  3. Pick the start hour

    See the best start hour for each coat, how sure that is, and when dew or rain would catch it.

In the app

See it on a real forecast

Real forecasts for Austin, Central Texas, captured October 5, 2026. Yours will be for your own place and limits.

The week at a glance for Austin, Central Texas: each step with its best window each day and the share of forecast runs that hold it
Your week at a glance. Every one of your steps, each day's best window, and the share of forecast runs that keep it workable.
Hour-by-hour grid for Caulk, glaze & carpentry repairs in Austin, Central Texas, each hour coloured by the share of forecast runs in which it works
Hour by hour: Caulk, glaze & carpentry repairs. Each square is one hour, coloured by how many forecast runs say the job works then. Tap one to see why.
Forecast spread chart for Caulk, glaze & carpentry repairs in Austin, Central Texas: the range of the forecast runs against your limit
Forecast spread. How far the forecast runs disagree, drawn against your own limit, so you see how close a call is.

What you get

Built for exterior painting and coatings contractors

  • Coat-and-cure odds by start hour

    Every start hour today and tomorrow, with the odds the film stays warm, clear of dew and dry until it is rain-safe, and the hour dew or rain would catch it.

  • Recoat clock

    When the last coat is ready for the next one, counted from when it went on: slower in cool hours, paused in cold or dew.

  • Surface temperature today

    Which hours the wall is above your product floor and clear of dew, as an estimate for your siding, masonry or metal.

  • Stop-before-sunset coats

    Prime, finish and recoat steps end a set time before sunset, so evening dew misses the wet film.

  • Elastomeric and masonry 24-hour rain check

    Stucco, block or tilt-up: dry masonry before, warm enough after, and a full day without rain on the thick film.

  • Stain days that won't flash

    Deck, fence, cedar and log stain on wood dry for two days, between 50 and 90 °F (a starting point: use the can) and clear of dew.

The steps it times

  • Pressure-wash & prep day

    Wash, scrape and sand, leaving the siding a day to dry before primer.

    6-hour window · daylight only

  • Prime / first coat

    Spot-prime bare wood and repairs, or lay the first coat of a two-coat system.

    4-hour window

  • Finish coat

    The topcoat the homeowner sees, started early enough that dew does not hit it wet.

    5-hour window

  • Stain coat (deck, fence, cedar or log)

    Penetrating or semi-transparent stain on bare, dry wood that must not flash in full sun.

    4-hour window · daylight only

  • Elastomeric or masonry coating

    Stucco, block or tilt-up: a thick film that needs dry masonry and a full day without rain.

    6-hour window

  • Caulk, glaze & carpentry repairs

    Beads at trim, windows and joints, plus patch and glazing, inside the tube's temperature range.

    4-hour window · daylight only

  • Recoat & touch-up

    Second coat on one elevation, touch-ups and the punch list before the walk-through.

    3-hour window

What else it watches

  • Coat-and-cure odds by start hour
  • Recoat clock
  • Surface temperature today
  • Rain on the job, last 3 days (is the siding dry?)
  • Gusts for the spray rig
  • Frost on the walls tonight

Every answer counts the forecast runs that keep the whole step inside your limits, at your job.

Founding members

Join the beta — your first six months free

Only 10 founding places: the first 10 exterior painting and coatings contractors to apply get the Exterior Painting & Coatings edition free for six months when it launches. No card needed. When they're gone, it's the waitlist.

Only 10 founding places.

  • Your first six months of the Exterior Painting & Coatings edition free when it launches
  • Early access to the app as it is today
  • A say in which steps the Exterior Painting & Coatings edition times next

Questions

Asked before you start

How is this different from a weather app?

A weather app gives one forecast and a rain chance. This runs each coat, and the hours after it, through each of up to 146 forecast runs and tells you how many keep it clear of dew, cold and rain.

Can I keep a record of my calls?

Yes. Log a coat decision and the decision log keeps the odds, the forecast dew spread and temperature and your note for that job. Export it to CSV. It records what the forecast showed, not readings off the wall.

Does it know my wall temperature?

No forecast does. It estimates it from air, sun and wind for your surface type and labels it an estimate. It does not know which way a wall faces or what shades it.

What data does it use?

Forecasts for the job's grid cell: an hourly forecast plus up to 146 runs from three independent forecast systems, pooled and judged run by run, 14 days ahead. Only the runs that carry humidity judge dew, and each card says how many.

Whose limits are built in?

Sherwin-Williams data-sheet numbers as defaults; the rest say "starting point". Your product's data sheet always wins: set it in Setup. The Sherwin-Williams 35 °F, 5 °F above the dew point and 2–3 h rain-free figures are per research notes, unverified: we could not open the data sheets themselves.

What can't it tell me?

It has no moisture meter, so it cannot tell whether siding, deck boards or stucco are dry enough to coat. Dew on the film is inferred; there is no wetness sensor. There is no radar or lightning, so a pop-up shower over the job cannot be called an hour out.